Shore Band After Your Pour, Not Before You Name Chemistry
Shore guesses before chemistry waste a prototype. Name the pour first, then Shore, MOQ 20.

On this page
The Shore guide already exists. This URL is the order of operations: chemistry, then Shore, not a Shore number in the first email with no pour.
RUUIPON cuts custom silicone molds in Shenzhen since 2018 for brand and Shopify buyers. MOQ 20 trays per design. Complete RFQs typically get a reply in about 24 hours. Prototype is commonly 3-7 business days after CAD lock. Drawing deposit ~$50 USD when we must model cavities.
Chemistry First
If the first sample looked fine, wait until later cavities before you approve a production sheet. Restock is where this failure shows.
What Can Nudge After Prototype
| Input | What it does |
|---|---|
| Shore 30 no pour | We ignore it |
| Epoxy peak C | Then Shore band |
| Chocolate vs resin | Two bands |
| MOQ 20 | Per design |
Guide: Shore hardness guide. After CAD lock: after CAD lock.
Not a Repeat of the Shore Guide
Guide: Shore hardness guide. After CAD lock: after CAD lock.
What to Put Instead of a Shore Number
Pour, peak C, undercuts, qty - not a lonely Shore number.
FAQ
Can I demand Shore 20?
If the pour allows. We will push back if it will oval.
MOQ?
20.
Tin-cure hobby Shore?
Not our production default.
Quote: contact or WhatsApp +86 135 3006 2969.
Ready to order custom silicone molds?
Free quote for OEM/ODM projects. MOQ 20 · Prototype 3-7 days · FDA/LFGB available.
