MOQ 20 pcs · 3D design $50 USD · Prototype 3–7 days

WhatsApp +86 135 3006 2969

RUUIPONRUUIPON
Blog/silicone mold shore hardness after pour chemistry

Shore Band After Your Pour, Not Before You Name Chemistry

Shore guesses before chemistry waste a prototype. Name the pour first, then Shore, MOQ 20.

Kyler Yang · Founder12 min read
Shore Band After Your Pour, Not Before You Name Chemistry

The Shore guide already exists. This URL is the order of operations: chemistry, then Shore, not a Shore number in the first email with no pour.

RUUIPON cuts custom silicone molds in Shenzhen since 2018 for brand and Shopify buyers. MOQ 20 trays per design. Complete RFQs typically get a reply in about 24 hours. Prototype is commonly 3-7 business days after CAD lock. Drawing deposit ~$50 USD when we must model cavities.

Shore Band After Your Pour, Not Before You Name Chemistry
Shop tray reference for this SKU family. Not a catalog clone.

Chemistry First

If the first sample looked fine, wait until later cavities before you approve a production sheet. Restock is where this failure shows.

What Can Nudge After Prototype

InputWhat it does
Shore 30 no pourWe ignore it
Epoxy peak CThen Shore band
Chocolate vs resinTwo bands
MOQ 20Per design

Guide: Shore hardness guide. After CAD lock: after CAD lock.

Not a Repeat of the Shore Guide

Guide: Shore hardness guide. After CAD lock: after CAD lock.

What to Put Instead of a Shore Number

Pour, peak C, undercuts, qty - not a lonely Shore number.

contact. prototype reject.

FAQ

Can I demand Shore 20?
If the pour allows. We will push back if it will oval.

MOQ?
20.

Tin-cure hobby Shore?
Not our production default.

Quote: contact or WhatsApp +86 135 3006 2969.

Ready to order custom silicone molds?

Free quote for OEM/ODM projects. MOQ 20 · Prototype 3-7 days · FDA/LFGB available.

Need a custom mold?

MOQ 20 · Quote in 24h

WhatsAppInquire