Tooling Archive and Reorder: Spare Trays Before the Listing Dies
One sheet tears on Thursday. Ads stay on. Reorder is not overnight. This service is how we store the approved tool and how you buy the next lot without reinventing CAD.
2018
Shenzhen shop
MOQ 20
Per design
3-7 days
After CAD lock
~24h
Complete RFQ
Reference the archive ID on the next PO

If CAD was honest and you did not change undercuts, reorder skips redesign. It does not skip production queue and ship. Keep the ID on the PO.
When a spare sheet is cheaper than a dead listing
A second design is a second MOQ 20. Recolor of the pour is not a new mold MOQ unless you need another sheet set.
| Situation | Usual ask |
|---|---|
| Ads on, 1 sheet | High risk |
| Spare 10-20% cavities | Common |
| New undercut | New design, new MOQ 20 |
| Colorway only | Same cavity |
Not a twin of lead time explained
That blog is the calendar. This is the commercial reorder path and archive habit.
Reorder RFQ
Archive ID, qty of trays, whether geometry changed, destination.
FAQ
Prototype again?
Usually no if CAD is locked and the pour is unchanged.
MOQ on reorder?
20 trays if you need another production lot.
Changed logo depth?
That is a new design.
Related process pages
- ServiceDFM reviewRUUIPON DFM review for custom silicone molds: draft 1-3 deg, island meat, undercut budget, Shore after chemistry. MOQ 20. Not a WYD plant depositor brief.
- ServiceVacuum platinum traysPlatinum-cure production sheets with vacuum degassing for brand restock. MOQ 20, Shenzhen since 2018. Not a tin kit and not a plant mogul tool.
- ServiceMulti-cavity productionProduction multi-cavity silicone trays for brand yield. Spacing, web mm, pack math. MOQ 20. Not a one-cavity hobby tool.
- ServiceFood-contact quotingQuote food-contact silicone molds with FDA 21 CFR 177.2600 and LFGB sections 30/31 on request. No FDA-approved factory language. MOQ 20. Brand lane, not plant mogul.
Send the files for this process
Send your design, target material, and quantity. We confirm silicone grade, hardness, and certification needs - usually within 24 hours.
